Baywa Solar Project Birkins Rd Carwarp

waterex • Nov 15, 2019

Site prep (Oct 2017) to internal roads (Dec 2018) for beginning of 130 megawatt Solar Farm installation

By waterex 29 Sep, 2021
This is our new waste recycling washplant for the recovery of sand and aggregates which has formely been a bi-product of our concrete recycling process. Very excited to see this in operation after well over two years of planning. This will not only divert industrial waste from landfill but also provide the local area with more sand choices, which are currently in short supply. This plan produces 5 products: 0-2mm sand 2-4mm sand 4-10mm aggregate 10-16mm aggregate 16mm – oversize (mostly 20-25mm) All the above products are washed and ready for use.
By waterex 15 Nov, 2019
Construction of 300m of 2100mm RCP pipe including 5 access chambers from 4m deep to 6m deep including crossing 16th St and a 9m bore under three major services. See video below and more still images in our gallery of the project.
By waterex 15 Nov, 2019
Wentworth Shire Council commissioned us to put a poly pipeline 180 HDPE under the Darling River in Wentworth. This is the new rising main for the new sewer project which is to happen in the coming year (2019)
By waterex 15 Nov, 2019
Works involved a complete remodel of the Houseboat Wharf at Dareton NSW for the Wentworth Shire Council
By waterex 15 Nov, 2019
Project involves the supply and installation of almost 5km’s of 150mm rising main, new Pump station, gravity sewer and demolition of existing Wastwater Treatment plant. This is for the township of Dareton in the south west corner of NSW.
By waterex 15 Nov, 2019
Wentworth Shire Council commissioned us to put a poly pipeline 180 HDPE under the Darling River in Wentworth. This is the new rising main for the new sewer project which is to happen in the coming year (2019)
Share by: